Five Lean principles
- Define value from the customer’s perspective.
- Consider the entire value stream.
- Organize a continuous flow of work without unnecessary delays.
- Establish pull based on the needs of the next link in the chain.
- Continue improving the process.
How to prevent defects
Poka-yoke — protection against unintentional errors
These are devices and solutions that help prevent an error or detect it directly where it occurs. A blocking mechanism prevents the incorrect operation from continuing; a warning reports a deviation but requires a response.
Training example: duplicate request
Suppose that, after a slow system response, an employee submits a request again. Both records go through approval and become two orders. The team examines the entire path from pressing the button to registering the need.
- Warning: show the number of the request already accepted and its submission status.
- Prevention: assign the operation a unique identifier and do not create a second record when a request is repeated.
- Testing: reproduce a double click, loss of connection, and resubmission after the connection is restored.
- Observation: track duplicates, waiting time, and user inquiries.
Should all similar requests be blocked?
No: two identical items may represent two genuine needs. In the training example, the goal is to prevent the same operation from being processed twice, not to prohibit similar orders. The rule must distinguish a technical repeat from a new user intention.
How to see waste in everyday work
For an initial review, you can trace one need from the moment it arises for an employee until the result is received. Record not only the actions but also the waiting periods between them. In an office process, waste may appear as re-entering the same data, forwarding files between systems, searching for the right version, waiting for approval, and correcting an incomplete request.
Next to each operation, it is useful to ask: what result does it create, and who needs it? A check required to manage risk or fulfill a mandatory requirement cannot be canceled simply because the customer does not see it. First determine its purpose and whether that purpose can be fulfilled more simply.
Process review: from observation to change
| Observation in the training process | Possible change | What to check |
|---|---|---|
| An employee repeatedly re-enters department details. | Populate them with verified data from the directory. | Are outdated details being used? |
| A request is waiting to be handed over to the next person responsible. | Make the queue and the assigned person visible. | Has waiting time decreased without overloading the next stage? |
| Incomplete requests are returned several times. | Display the required information before submission. | Have returns decreased, and have formal placeholder responses appeared? |
The table contains hypotheses for a pilot, not a universal set of mandatory functions. The same field may be necessary for a complex procurement process and excessive for a simple one. Form design should take real work scenarios into account.
How to design error-proofing
Let us return to resubmitting a request. The message “do not click twice” requires the user’s constant attention. Checking the operation identifier moves this task into the processing mechanism. But it must also be tested: a repeated request should return the result of the first operation, while a new, independent request should be created normally.
Develop scenarios involving a delayed response, a page refresh, and connection recovery. Make sure the employee understands the operation’s status. Technical duplicate prevention is of little help if the user cannot see the accepted request and starts circumventing the established process through emails and phone calls.
How can you tell whether an improvement is genuinely useful?
For the pilot, monitor the time from the emergence of a need to the result, the number of returns, technical duplicates, and requests for assistance. Compare operations of the same type. If one area becomes faster but the queue simply moves further along, the entire flow needs to be reconsidered.
Implementation mistakes to avoid
- Starting by reducing resources before understanding the causes of waste.
- Automating unnecessary actions instead of reconsidering whether they are needed.
- Introducing blocks without a clear way to handle exceptions.
- Designing changes without involving the people who perform the work.
- Evaluating the result solely by the number of tasks processed.